Airport Projects

John Wayne Airport anticipates issuing Requests for Proposals (RFPs) / Requests for Qualifications (RFQs) for the following projects. Please note that this may not be a complete list of upcoming projects, and all dates are estimates and subject to change at any time.

Project Name:

Parking Structure C - Phase 2

Project No.:

P200

Project Description:

JWA plans to build a four-level extension of Parking Structure C, comprising of approximately 1,500 parking spaces. This extension will carry over the design elements of Parking Structure C, including the BRB structural system, and utilizes common footings at the south end of the existing parking structure.

Status:

A-E Agreement approved August 13, 2013 with Balfour Beatty Construction/IDS Group, Inc.

Upcoming Milestones:

RFP issuance to prequalified proposers anticipated in August 2014.

Project Manager:

Kory Hariri
(949) 252-6098
khariri@ocair.com

Project Name:

Thomas F. Riley Terminal Complex Improvements Project

Project No.:

P202

Project Description:

The Thomas F. Riley Terminal Complex Improvements Project brings various improvements to the Terminal Complex at JWA. Where applicable, all project improvements will be completed to the essential facility standard. These improvements include, but are not limited to architectural improvements; seismic upgrade of Terminal A & B including structural and non-structural items; electrical infrastructure; heating, ventilation and air-conditioning (HVAC) and mechanical systems; plumbing systems; lighting systems; American with Disabilities Act (ADA) compliance; Information Technology (IT) systems; security and closed circuit television (CCTV) systems; general aesthetics improvements; and fire sprinkler and alarm systems. These improvements will improve existing facilities aesthetics and infrastructure, allowing patrons of JWA and Orange County to experience a uniform level of quality throughout the Terminal Complex.

Status:

Notice to Design-Build Entities Inviting Prequalifications

Upcoming Milestones:

Prequalification Documents Due on April 30, 2014.

Project Manager:

Rick Cathey
(949) 252-5128
rcathey@ocair.com

Project Name:

Bristol Street Slope Stabilization

Project No.:

P204

Project Description:

Construction of a retaining wall system upon the south boundary of the John Wayne Airport property adjacent to North Bristol Street

Status:

View Bid Recap Sheet

Upcoming Milestones:

Project awarded to Earth Construction & Mining on April 1, 2014.

Project Manager:

Steve Chaky
(949) 252-5275
SChaky@jwair.com

Project Name:

Paularino Gate Improvements

Project No.:

P211

Project Description:

The Paularino Avenue Gate is JWA’s main vehicular airfield access gate and is located at the southeast terminus of Paularino Avenue. The intersection of Paularino and Airway Avenues is approximately 450’ northwest of the Paularino Avenue Gate. The intent of the project is to accomplish the following:

  • Paularino Street Reconstruction
  • JWA Administration Building Improvements
  • Guard Shelter and Security Fence Improvements

Status:

Statement of Qualifications (SOQ) for Architect-Engineer services in review process.

Upcoming Milestones:

Board selection of A-E firm anticipated on May 6, 2014. Board award anticipated on July 15, 2014.

Project Manager:

John Pape
(949) 252-6058
jpape@ocair.com

Project Name:

Terminals A&B BHS Enhancements

Project No.:

P272

Project Description:

The project provides for improvement to the Terminals A&B baggage handling systems. The improvements include ticket counter, curbside, makeup and other baggage conveyor modifications as well as improvements to the Transportation Security Administration (TSA) Checked Baggage Inspection Systems (CBIS).

Status:

View Bid Recap Sheet

Upcoming Milestones:

Construction Agreement awarded to Glidepath, Inc. on March 25, 2014.

Project Manager:

Don Horn
(949) 252-5097
dhorn@ocair.com

Project Name:

Campus Drive/Bristol Street Right Turn Lane Project

Project No.:

P278

Project Description:

The project consists, in general, of widening southbound Campus Drive to provide an additional 600 foot long, third right turn lane onto northbound Bristol Street. The work includes removal of existing facilities and vegetation, demolition of an existing maintenance building, site clearing, grading, road pavement, curb return, retaining wall, traffic signal modification, temporary security fence, perimeter security fence, signing, striping and pavement marking, curb and gutter, landscaping, tree removal, and adjusting and relocating utilities and amenities in and around the project site.

Status:

A-E Agreement approved with Stantec on June 18, 2013.

Upcoming Milestones:

Construction bid advertisement anticipated May 2014.

Project Manager:

Steven Carrillo
(949) 252-6020
scarrillo@ocair.com

Project Name:

Lighting System Upgrades

Project No.:

P402

Project Description:

Throughout the Riley Terminal and other facility locations, JWA currently utilizes a mixture of T12 parabolic fixtures, T12 soffit fixtures, T12 open architecture fixtures, multi-lamp open architecture fixtures, high-intensity discharge (HID) fixtures, and high pressure sodium light fixtures. JWA seeks to replace these fixtures with efficient T8, LED, or similar fixtures.

Status:

TTG Engineers selected as the primary A-E firm and P2S Engineering, Inc. as the alternate firm.

Upcoming Milestones:

Board award anticipated on June 17, 2014.

Project Manager:

Leo Tang
(949) 252-6068
ltang@ocair.com

Project Name:

Cellphone Lot Project

Project No.:

P405

Project Description:

The Cellphone Lot Project will reconfigure the existing taxi lot to accommodate both a taxi staging lot and a separate cellphone lot. The existing taxi lot, in its current configuration, accommodates roughly 105 taxis and limos. The new design will divide and reconfigure the lot to accommodate roughly 115 taxis and limos in one lot, and roughly 33 spaces for airport patrons in the cellphone lot.

Status:

Statement of Qualifications (SOQ) Architect-Engineer services in review process.

Upcoming Milestones:

Award of A-E Agreement targeted for April 8, 2014.

Project Manager:

John Pape
(949) 252-6058
jpape@ocair.com

Last Updated: April 8, 2014